From the
organisers of
Hillhead logo

Tarmac invest in improved screen technology

Finedoor have completed the installation of two asphalt screens at Tarmac’s Scunthorpe Santon site to replace old grease-lubricated screens.

Tarmac currently operate two asphalt plants at the site. A 7m x 2.1m, three-and-a half-deck screen with oil-bath system has been installed in one, while a second 4.6m x 1.2m, four-and-a-half-deck screen has been installed in the other.

The replacement screens have provided Tarmac with a range of benefits as both screens incorporate pumped oil lubrication with computer monitoring and each is fitted with an oil recircula-tion system with oil filtration and air-blast cooling to provide stabilized temperatures. Both screens are self-regulating, requiring little or no maintenance. The second unit is fitted with total rubber encapsulation to provide environmentally friendly operation.

 

 

 

Latest Jobs

Civil Engineer (Quarries)

Forestry and Land Scotland (FLS) is seeking a Civil Engineer (Quarries) for their South Region, to manage the quarries and stone production programme