From the
organisers of
Hillhead logo

No-spillage loading chutes

 

Cleveland Cascades have introduced a new range of bulk material loading chutes designed for use with closed road and rail tankers and featuring a self-closing valve which allows movement of the chute without any dust or product escaping.

"Designed to handle a range of materials at loading rates of up to 250m³/h, the compact chutes allow installation where space is at a premium. They also feature dust extraction from the base of the chute rather than the top for maximum efficiency. A material-detection system, based on a capacitance effect, is also offered."

 

"The chute has been developed in conjunction with Buxton Lime Industries where, for several months, it has been trialled loading quicklime fine powder."

 

Tags

 
 

Latest Jobs

Engineering Project Manager

Cemex have an excellent opportunity for a suitably qualified individual to be involved with a number of exciting engineering projects they have in the pipeline