19 - 21 June 2012
International live demonstration show for the quarrying, recycling and heavy construction industries at Hillhead Quarry, Buxton, UK.
Register for your free fast track entry badge
A tunnel, in the ground below a surge pile, which houses the feeder and conveyor used to draw off material at a controlled rate.
[img_assist|nid=15074|title=Reclaim tunnel|desc=|link=none|align=left|width=266|height=200]
The monthly journal for the quarry products industry.
Subscribe